Planning a tiling job: what affects the price, and what to check before you book anyone
Nearly every call starts with “roughly what does this cost?”. The honest answer is that it depends on the job, so we quote every job individually. But the things that move the price are predictable, and so are the corners a cheap quote cuts. Here is how we price work, and what to look at in any tiler’s quote before you sign it.
Written by the team at Pixel Tiling, Christchurch & Canterbury
How we price a job
We don’t publish set prices. Tile and material costs change often, and no two rooms are the same. Instead, every job gets its own fixed written quote once we have seen it, or good photos of it.
- Splashbacks and small jobs can often be priced from photos and a couple of measurements.
- Bathrooms, floors and bigger jobs get a free visit first, so the quote covers the real prep and waterproofing the room needs.
- The quote is itemised (prep, waterproofing, tiling, grout and silicone, rubbish removal) and is GST inclusive.
- Tiles can be supplied by you or ordered by us; the quote makes clear which.
What moves the price up or down
- Tile size and layout. Large-format tiles need a flatter substrate and more care. Herringbone, brick-bond offsets, mosaics and feature patterns are all more cutting and more labour than a straight stack bond.
- The surface we are tiling onto. If the walls and floor are flat, sound and the right material, we tile straight onto them. If not, they need sheeting, patching or a self-levelling compound first. That is real time and material.
- Waterproofing. Every wet area we do is membraned to code. Some cheaper quotes leave this out or do the bare minimum. See the checklist below.
- Demolition. Removing old tile, screed or a shower base, and getting the rubbish off site, adds a day or more on a bathroom.
- Cuts and detail. Niches, mixer and rail penetrations, window reveals, drainage channels and mitred external corners all take time to do properly.
- Access. Second-storey bathrooms, tight parking, and carrying materials a long way all add up over a job.
- Who supplies the tiles. You can supply your own, or we can order them. Either way, allow 10 to 15% extra for cuts, wastage and future repairs.
What to check in any tiler’s quote
This list is worth going through with whoever you are considering, not just us.
- Is waterproofing included, and does it say it is done to the New Zealand Building Code (E3) with a proper membrane system?
- Who supplies the tiles, and has wastage been allowed for?
- Are movement joints included, not just grout in the corners?
- Will internal corners and the wall-to-floor junction be silicone, not grout? (Grout there cracks.)
- Does the bathroom floor have falls to the waste so water drains?
- Is it a fixed price or an estimate, and is it GST inclusive?
- Is rubbish removal included, or left to you?
- What is the timeframe, and does it allow for waterproofing cure time?
Common mistakes we get called to fix
- Tiling over failed or missing waterproofing. It looks fine for a year, then the wall behind the shower goes soft.
- No falls on the floor. Water sits in the corners instead of draining to the waste.
- Wrong adhesive for the tile or the substrate, so tiles debond or sound hollow.
- Grout in the corners instead of silicone. It cracks as the building moves.
- Large-format tiles with poor coverage underneath. They crack under load or sound drummy.
How long a job takes
- Day 1Splashback: measure, cut, set, and usually grout the same day.
- Days 1-2Bathroom prep: demo if needed, sheet and patch, set falls, then waterproof.
- CureThe membrane needs 24 to 48 hrs to cure before tiling. This cannot be rushed.
- Days 3-5Tiling, then grout, then silicone once the grout has set.
- FinishA standard bathroom is usually about a week start to finish. Wait 24 to 48 hrs before using the shower.
Common questions
Do you supply the tiles?
We can order them for you, or you can supply your own. Plenty of clients pick their tiles at a local supplier and we lay them. Either way we will tell you how much to order.
Can you tile over existing tiles?
Sometimes, if the existing tiles are sound, flat and well stuck down. Often it is better to take them off so the finished height and the waterproofing are right. We will tell you which applies on your job.
Do you do the waterproofing yourselves?
Yes. We are licensed applicators for Mapei and ATA systems, and we membrane every wet area we tile. It is not subbed out.
How long before I can use the shower?
Allow 24 to 48 hours after grouting and siliconing before the shower gets used, so everything cures properly.
Do you work outside Christchurch?
Yes, across Selwyn, Waimakariri and North Canterbury. Tell us where the job is and we will let you know.
Do you take on small jobs?
Yes. A lot of our work is splashbacks and single-room jobs.
Are quotes free?
Yes. Send photos and rough measurements for a ballpark, and we will visit for anything bigger than a splashback before giving you a fixed written quote.
Planning a job?
Send through your details and a few photos and we will come back with a price.